Experience
Featured
All case studies
Defects Quantification for a 55ML Waste Water Treatment Plant
On a regional wastewater facility, Accura was engaged to quantify defect claims and assist in preparing supporting submissions. Accura’s forensic quantity surveying capability ensures defect and make-good assessments are grounded in facts.
Level Crossing Removal Alliance - Shutdown Strategy Support
Accura provided delay analysis and shutdown planning support to a major alliance delivering level crossing removals within tightly constrained possession windows.
133MW Wind Farm - Delay and Prolongation Assessment
Accura was engaged by a European EPC contractor delivering a 133MW wind farm comprising 31 wind turbine generators. Our analysis provided a clear cause and effect narrative linking events to programme impact and cost consequence.
Commercial and Subcontract Support for a South Australia Substation Upgrade
Accura’s advisory services draw on deep experience in power infrastructure, enabling us to provide disciplined, contractually sound commercial advice for a substation upgrade project in South Australia.
Growth Area Station Program | Delay Assessment
Accura Consulting undertook delay analysis for a new station development with our delay experts exposing the factual and logical basis of the alleged delay events, addressing concurrency and mitigation in detail.
Gas Turbine Project | Delay Expert Appointment
Accura Consulting’s delay experts were engaged as delay expert in adjudication proceedings concerning a gas turbine project where a subcontractor alleged critical delay.
Gas Plant Upgrade in Regional Victoria
Accura Consulting was engaged by a specialist EPC contractor to provide quantum and delay expert services on a technically challenging gas plant upgrade project in regional Australia.
Complex Major Central Sydney Precinct Development
Our team was brought in to assist with claims consulting, and to provide quantum and delay expert services relating to variations, interface issues, and cumulative delay impacts.
Claims Support for Royal Hobart Hospital Redevelopment
Accura Consulting was appointed by a tier one contractor to provide commercial and claims advisory services on the Royal Hobart Hospital Redevelopment.
Stadium Roof Issues – Quantum Expert Advisory
Accura Consulting was engaged by a specialist subcontractor involved in the construction of a major stadium in Western Australia to provide quantum expert services.
Delay, Disruption and Claims Management for Major Road Piling Works
Accura Consulting was engaged by a major civil works contractor to provide delay, disruption, and claims management services during the delivery of piling works on the Pacific Highway Upgrade
Renewables Challenges on Bulgana Wind Farm Project
Accura Consulting was appointed to support a leading international EPC contractor during the construction of the Bulgana Wind Farm, a 194MW renewable energy project located in western Victoria.
WestConnex M4 Project Delays and Unforeseen Site Conditions
Accura Consulting was engaged by a major joint venture contractor to provide commercial and claims advisory services during the delivery of the WestConnex M4 East—a key stage of one of Australia’s largest transport infrastructure projects.
Claims and Quantum Advisory for Sydney Metro City and Southwest Project
Accura Consulting was engaged by a tier one contractor to support the delivery of the radio communications package on the Sydney Metro City & Southwest project.
Claims and Quantum Advisory for a Major Australian LNG Project
Accura Consulting was engaged by a tier one international contractor to provide claims and quantum advisory services on a major liquefied natural gas (LNG) development located in Northern Australia.
New Build Ferry Hub in Sydney
Sydney is well-served by marine transport being ‘The Harbour City’. This project was the construction of a new ferry hub in central to the city, designed to increase ferry capacities and transportation services for thousands of travellers.
Medical and Radioactive Facility in Greater Sydney
A project to complete works to a medical and radioactive facility in Greater Sydney encountered a number of issues.
Pacific Highway Upgrade Project in northern New South Wales
A major highway upgrade project to introduce 20 kilometre of dual carriageway including bridges over rivers and flood plains, completed in mid-2018.
Major Regeneration Project Development in Sydney
The Project was a major redevelopment along the Sydney foreshore which includes a mix of commercial and residential buildings, an entertainment precinct, harbour walk and public parkland.
140ML Wastewater Treatment Plant Upgrade
The project involved the design and construction of a new sewage treatment facility with a hydraulic capacity of 140ML/day.