Experience
Featured
All case studies
Southern Queensland Correctional Facility Project
An important correctional facility construction project in Southern Queensland required claims, quantum, and delay advisory support.
Metro City Road Tunnel, Australia | Snapshot
Accura Consulting was employed by a major Employer following delays to a significant metro city road tunnel with a value of $5bn.
Sydney Arterial Road Project, Australia | Snapshot
Engaged by a major Tier 1 Contractor on a construct only road project, Accura Consulting supported the Contractor in preparing both quantum and delay claims, translating a complex set of delays into clear, easy to understand analysis.
Road and Bridge Project, Australia | Snapshot
Accura Consulting was engaged by an international Tier 1 Contractor following delays to a road and bridge design and construction project in Australia.
New Build Ferry Hub in Sydney
Sydney is well-served by marine transport being ‘The Harbour City’. This project was the construction of a new ferry hub in central to the city, designed to increase ferry capacities and transportation services for thousands of travellers.
Electrical Substation new builds in Sydney
The New South Wales Power Supply Upgrade Program introduced new Substations and Substation upgrades across the state to generate more robust and reliable power supply.
Pacific Highway Upgrade Project in northern New South Wales
A major highway upgrade project to introduce 20 kilometre of dual carriageway including bridges over rivers and flood plains, completed in mid-2018.
Major Road Bridge Replacement Project
A major bridge replacement project in southern New South Wales was launched to help build netter connection in and around the bay town for motorists, freight, river users, pedestrians, and cyclists.
Major Regeneration Project Development in Sydney
The Project was a major redevelopment along the Sydney foreshore which includes a mix of commercial and residential buildings, an entertainment precinct, harbour walk and public parkland.
140ML Wastewater Treatment Plant Upgrade
The project involved the design and construction of a new sewage treatment facility with a hydraulic capacity of 140ML/day.
Woolgooga to Ballina Road and Bridge Pacific Highway
The Woolgoolga to Ballina Pacific Highway upgrade was the final link in the Pacific Highway upgrade, between Hexham and Queensland border to be upgraded to four lanes, divided carriageway
Never miss an update
Sign up with your email address to receive news and updates.