Delay Expert Lessons from Zweite M/S “Philippa Schulte” Shipping GmbH v PSA Corp Ltd
Delay Expert credibility depends on thorough evidence collection, impartial analysis, and adherence to recognised standards. Zweite vs PSA demonstrates lessons for delay and quantum experts.
Why an As-Built Programme Is the Most Underrated Document on Any Project
The As-built programme may be the most underrated document on any project for delay experts. A vital record of what really happened, activity by activity, as the project unfolded.
Why Courts Do Not Require Perfect Proof of Prolongation Costs
The strongest prolongation claims are not necessarily those supported by the largest volume of records. Delay experts build the strongest claims with an evidentiary pathway that is clear, logical and capable of being tested.
V601 Developments v Probuild: Time vs Cost
V601 Developments v Probuild confirms that delay and disruption must be proven independently. Disruption techniques can suggest loss, but only a forensic QS and quantum expert can show cause and cost with evidence.
Disruption is not an Entitlement, rather it is the Cost Consequence of Change
For quantum experts, CPB Contractors v Transport for NSW completes the progression from Kvaerner to Probuild. It confirms that inefficiency is not a separate claim. It is the cost consequence of change.
What Negative Float Is Quietly Telling You
A negative number on a programme is the schedule telling you and experienced delay experts that the project is already behind where it needs to be to hit the contracted date.
Concurrent Delay: What Does Effective Cause Require?
True concurrent delay is rarer than the term suggests as delay experts understand. Two genuinely independent causes, each capable on its own of causing the same period of critical delay at the same time.
Time is One Story, Cost is Another: V601 Developments v Probuild
In construction claims, delay and disruption are different things. Delay is about time. Disruption is about cost. The two demand different evidence from experienced quantum expert witness and delay expert witness.
Why Retrospective Delay Analysis Carries Weight
Prospective methods are useful during delivery but once the work is complete, those models compete with actual events and, that’s where retrospective methods take precedence.
Prolongation Costs: Costain v Haswell and How It Reads in Australia
Melbourne and Brisbane delay and quantum experts examine prolongation costs, Costain v Haswell and what Australian construction disputes can learn from the decision.
Courts Don’t Buy Global Claims. Nor Should QS Experts.
The case of John Holland Construction & Engineering Pty Ltd v Kvaerner R J Brown Pty Ltd remains one of the earliest and most important Australian warnings against “rolled-up” or “global” claims for quantum experts to consider.
The Steps an Expert Must Take When Analysing and Opining on Disruption Claims
The decision in Santos Limited v Fluor Australia Pty Ltd does more than explain what disruption is. It shows, in practical terms, how a disruption claim must be analysed and proven.
The Discretionary EOT Clause Nobody Reads Until It's Too Late
Most EOT clauses are read as hurdles but there’s one that is often missed, and it gives the principal or head contractor a discretionary power to grant an EOT even where no valid claim has been made at all.
Why Retrospective Analysis Carries Weight
Construction delay expert insight: why retrospective delay analysis holds up in court, drawing on V601 v Probuild and Kane v Sopov, to show what actually makes a delay claim defensible.
What Form of Delay Analysis is Most Supported in Australia?
When faced with a construction delay, you may wonder what form of delay analysis is most supported in Australia: prospective or retrospective? Any delay expert worth securing knows where recent judgments sit.
Experience is Not Evidence: The Quantum Lesson from Santos v Fluor
Experience isn't evidence. Santos v Fluor shows why an effective quantum expert witness needs more than industry experience. Courts expect transparent methodology, construction costing expertise and evidence that withstands scrutiny.
Exploring Global / Total Loss Claims
Claims for prolongation costs are challenging because entitlement and quantification are rarely the sole matters in dispute. For delay experts and quantum experts, analysis and reports need more.
Rejected Baselines and Continuing Obligations
A widespread misconception in construction project controls holds that a programme has no value until formally approved by the Engineer, Project Manager, or Employer. For forensic delay experts, this is one of the key spaces delays begin.
Proving Disruption - What Santos v Fluor Decided
Fore forensic quantum experts and delay experts, Santos v Fluor is an example of how when you can show the chain of causation with evidence in the contemporaneous record, the claim has a foundation.
Why Most Extension of Time Claims Fail Before They Reach a Programme
Most extension of time disputes are lost in the gap between what happened on site and what got written down. By the time a delay expert opens the file, the outcome is often already half-decided.
Never miss an update
Sign up with your email address to receive news and updates.
Accura Consulting is purposefully lean and independently owned.
We are forensic quantum and delay experts not bound by restrictions and bureaucracy, enabling us to easily adapt to rapidly changing landscapes and provide a tailored approach effective to the situation.
We are committed to establishing and nurturing long-term client relationships built on respect, trust and excellence.
Our Vision is to help our clients make confident decisions. We are there to provide guidance and help clients gain a better understanding of the process and situations they find themselves in. That’s why our news and insights features an array of learning articles to help you find the answers to problems you may encounter.