A major bridge replacement project in southern New South Wales was launched to help build netter connection in and around the bay town for motorists, freight, river users, pedestrians, and cyclists.
Major work on the replacement bridge project commenced in 2019 with the new bridge opened to traffic in March 2021. Removal of the existing bridge and foreshore upgrade work was completed in July 2022.
Public projects can often face variations to the scope of work and this project was no different. Our experts were retained by the Head Contractor to prepare and prosecute claims for quantum and time relating to numerous variations to the scope of works on the project.
Featured project value: $275m
Project Date: 2023
Location: Australia
Service: Claims Consulting, Commercial and Contract Management
Industry: Infrastructure, Roads
Accura expert: Paul McArd
Possessing real-world industry experience can be critical in understanding claims and demonstrating cause and effect of delays.
Experts from Accura Consulting conducted a forensic analysis of the case, guiding the Contractor with the preparation of various claims for time and cost. Our team developed a tailored solution, developing comprehensive claim document demonstrating entitlement to time and cost, substantiation of the amounts claimed and reasons for the claim.
Our evidence-based approach recovered significant cost and secured an extension of time for the Contractor.