A headshot of a smiling man with dark hair, glasses, wearing a white shirt and dark blazer, against a light teal background.

Paul McArd

Managing Director

Qualifications

  • BSc (Hons) Quantity Surveying

  • LLM Construction Law and Arbitration

  • Chartered Quantity Surveyor (FRICS,)

  • Fellow of the Australian Institute of Quantity Surveyor (FAIQS)

  • Certified Quantity Surveyor (CQS)

  • Member of the Chartered Institute of Arbitrators (MCIArb)

  • Member of the Academy of Experts (MAE)

  • Fellow of the Chartered Institution of Civil Engineering Surveyors (FCInstCES)

Paul is the founder and Managing Director of Accura Consulting and in that time has advised clients in Australia, the Middle East, Asia and Europe on all types of projects and solving all types of problems relating to claims, delay, and the quantification of costs.

Paul has hands on project delivery experience gained on water, road, rail, mechanical and electrical, oil and gas, renewables, energy and building.

Paul has performed as an independent quantum and quantity surveying expert with over 30 appointments in high-value disputes before courts, tribunals, and in arbitration across Australia and internationally.

Acted as an independent expert in more than 30 matters across Australia, the Middle East, and Asia-Pacific. Engagements have included:

  • Courts and Tribunals – County Court of Victoria, Supreme Courts of WA, Queensland, Victoria, and ACT, Victorian Civil and Administrative Tribunal.

  • Alternative Dispute Resolution – Arbitrations (domestic and international), Adjudications, Mediations, Binding Expert Determinations, and joint expert appointments.

  • Sectors – Major infrastructure (tunnelling, roads, bridges, rail), energy (wind farms, solar farms, battery storage), commercial developments, residential towers, schools, and stadiums.

  • Dispute Types – Prolongation and acceleration claims, variation valuations, defective works, latent conditions, termination costs, flammable cladding replacement, coordination of tender documentation, and insurance-related cost assessments.

  • Key Contributions – Delivered first principles, evidence-based costings; prepared expert reports; participated in conclaves; and provided oral testimony under cross-examination.

Paul is featured in the Lexology Index (formerly Who’s Who Legal):

"Employing a pragmatic approach, Paul uses his hands-on industry experience and is able to articulate his position clearly and calmly during cross-examination."

Simple white paper airplane icon on a dark blue circular background.
Icon of a white telephone handset on a dark blue circular background.
LinkedIn logo with white initials 'in' on a dark blue circular background.

Never miss an update from Paul

Sign up with your email address to receive news and updates.


Meet the rest of our leadership team

Ready to work with Paul? Get in touch with an expert today.